On Sunday April 19th 2009, Detroit 9th Battalion companies responded to a reported dwelling fire. Upon arrival of Engine 50 they stretched on this vacant 1.5 story dwelling. Companies operated for aprox. 30 mins to bring this fire under control. Engines 50/60/58/46 Ladder 23 Squad 6 & Chief 9 responded to this box alarm.
Camera: Nikon Corporation (Nikon D40) |
Original size: 2000px x 3008px |
Current: 200px x 300px |
Other sizes:
Small
•
M •
L |